Lagging and Insulation (A8804)

About this class


This comprehensive inter active multimedia-training program consists of four lessons that train participants to select, measure, cut, and install piping properly.



Prerequisites


This lesson is designed for participants familiar with the proper use of hand tools and precision measuring instruments. A familiarity with pipefitting materials, layout, tubing, threaded pipe and the preparation for piping installation is also required.

Description


This lesson shows and explains the procedures for measuring and cutting block insulation for piping elbows and flanges, for installing the insulation, and for covering the insulation. The lesson includes information on the sequence in which the steps should be performed and the materials needed for each step.

Objectives


Calculate the size of each piece of insulation needed for a piping elbow. Mark and cut block insulation for a piping elbow. Install block insulation on a piping elbow. Cement the piping elbow insulation. Measure the amount of insulation needed for a flange. Score flange insulation so it will fit snugly on the flange. Install block insulation on a flange. Cement the flange insulation. Measure and cut the insulation cloth covering. Install cloth covering on piping elbows and flanges.

Content

Lagging and Insulation (A8804)This lesson shows and explains the procedures for measuring and cutting
block insulation for piping elbows and flanges, for installing the
insulation, and for covering the insulation. The lesson includes
information on the sequence in which the steps should be performed and
the materials needed for each step.

  • activity icon Lagging and Insulation

Curriculum

Ratings and reviews

0
0 Reviews

 

Share

Pinterest
LinkedIn
Reddit
WhatsApp
Telegram